Monday, June 2, 2008

TAC Building-Site Visit (12/05/08)


ABOVE: Exerior overall photo of TAC building.


ABOVE: Photo of pre-cast concrete panels supported by temporary bracing.


ABOVE: Bondek, which is a product used as formwork for the pouring of concrete slabs. Bondek is not removed, becoming non-structural once the concrete dries. The Bondek can hae holes penetrated in it for the provision of services.

1 comment:

SRT251-2008-Daniella-Mikulic said...

hey i like how you label all your drawings it makes them really clear...