Monday, June 2, 2008

Bendigo Market Place Extension Construction Site-Visit 3(18/0508)


ABOVE: Hollow concrete slab on pre-cast concrete panels, supported by temporary bracing (in background).


ABOVE: Roof insulation and cladding has been installed in some parts of building.

ABOVE: Trench mesh ready for concrete slab installation. Air conditioning vents have been installed in the areas where the roof cladding and installation have also been installed.
Alot has happened since my last visit to the site. The roof cladding and insulation have been installed on some of the building, along with air conditioning vents. Trench mesh has been laid down ready for the installation of a poured concrete slab.
Alot has happened