ABOVE: Tutorial Exercise-Week 5
The above tutorial exercise is of concrete construction using pre-cast concrete panels. The difference between this tutorial exercise and the previous one, is that insulation has not been used in this tutorial exerise and in the previous tutorial exercise the concrete floor slab is non-structural, whereas in this weeks tutorial exercise, a combination of a reinforced concrete slab and an infil slab make the concrete floor slab structural.